Loudi Sewage Treatment Plant Laboratory Construction Management
2022-08-10 12:56:00 【Design and construction of SIGLAB】
What are the requirements for laboratory construction of Loudi Sewage Treatment Plant?The editor of SICOLAB will tell you about it
I. Considerations for the construction of the laboratory of the sewage treatment plant
The site selection should focus on how to follow the principle of site selection and how to coordinate with the overall planning when selecting a site.Indicate the topography, geological conditions, land area, sanitary protection distance, etc. of the selected plant site.
1. The quality and quantity of sewage, including the values of various indicators of sewage quality, the average flow of sewage, peak flow, current flow, and development waterEquivalent water data.
2. Selection and calculation of the technological process, mainly to explain the rationality, superiority and safety of the selected technological process.
3. Calculation of each treatment facility in the technological process, main dimensions, structure, material and characteristics of the treatment facility; additional equipment selectedmodel, performance and number of units.
4. The way out of the treated sewage and sludge.
II.Sewage treatment plant laboratory construction: sampleCollection and management of
Layout of sampling points for efficiency monitoring of sewage treatment facilities
1. When monitoring the efficiency of the overall sewage treatment facility, set sampling points at various inlets of sewage entering the sewage treatment facility and the total discharge of the sewage facility.
2. When monitoring the efficiency of each sewage treatment unit, set sampling points at the inlets of various sewage entering the treatment facility units and the discharge outlets of the facility units.
III.Sewage treatment plant laboratory construction:Management of the detection process
1. Quality assurance during inspection
1) Regularly use certified reference materials (samples) for intra-laboratory comparison a direct reading monitoring instrumentIn addition, certified reference materials should be used for comparison on a regular basis, and records should be made to ensure the accuracy of monitoring instruments.b In the method verification of the new project, the project with standard samples should be tested with certified standard samples, and the measurement results can be used as an important basis for evaluating the accuracy and precision of the project's experimental report.
2) When repeating inspections with the same or different methods for method validation of new monitoring items or improved monitoring methods, the same sample or standardSamples are tested repeatedly by the same or different methods, and a more scientific judgment can be made on the accuracy and precision of the method.
3) During the analysis process, standard substances can be added with batches to make the test data accurate and reliable.
2. Monitoring personnel fill in the quality control data report on time
After checking by relevant personnel, report to the person in charge for review.Quality control reports are filed together with monitoring original records.
边栏推荐
猜你喜欢
11 + chrome advanced debugging skills, learn to direct efficiency increases by 666%
吃透Chisel语言.36.Chisel实战之以FIFO为例(一)——FIFO Buffer和Bubble FIFO的Chisel实现
Is there a problem with the CURRENT_TIMESTAMP(6) function?
时间序列的数据分析(五):简单预测法
Digicert EV证书签名后出现“证书对于请求用法无效”的解决方案
es6-promise对象详解
「网络架构」网络代理第一部分: 代理概述
你是怎么知道数据库 Htap 能力强弱的?怎么能看出来
What are the five common data types of Redis?What is the corresponding data storage space?Take you to learn from scratch
技术人必看!数据治理是什么?它对数据中台建设重要吗?
随机推荐
Educational Codeforces Round 41 (Rated for Div. 2) E. Tufurama
phpstrom 快速注释:
Guidelines for Sending Overseas Mail (2)
关于flask中static_folder 和 static_url_path参数理解
search--01
Behind IDC's No. 1 position, what kind of "video cloud" is Alibaba Cloud building?
吃透Chisel语言.36.Chisel实战之以FIFO为例(一)——FIFO Buffer和Bubble FIFO的Chisel实现
Solve the idea that unit tests cannot use Scanner
线代 | 秒杀方法与技巧
部署项目半途而废后续
Hackbar 使用教程
娄底妆品实验室建设规划构思
漏洞管理计划的未来趋势
Keithley DMM7510精准测量超低功耗设备各种运作模式功耗
没有接班人,格力只剩“明珠精选”
娄底石油化工实验设计、建设规划概述
LeetCode中等题之比较版本号
iTextSharp 使用详解
如何让别人看不懂你的 JS 代码?把你当大佬!
CodeForces - 628D (digital dp)