当前位置:网站首页>Overview of Loudi Petrochemical Experiment Design and Construction Planning
Overview of Loudi Petrochemical Experiment Design and Construction Planning
2022-08-10 12:57:00 【SIGLAB Design and Construction】
What should I know about the design details of Loudi petrochemical laboratory?The editor of SICOLAB will tell you about it
I.Petrochemical laboratory constructionMeaning
The petrochemical laboratory is responsible for the specification analysis of raw materials and auxiliary materials for each production unit of the petrochemical plant, the quality control analysis of the intermediate products of the production unit and the product quality analysis, the medium index analysis of public works, the supervision and inspection of the quality of the manufactured products, and the whole-plant laboratory for other auxiliary tasks.The factory should set up a central laboratory, and the laboratory analysis items of the same or similar nature should be considered as a whole to avoid repeated design. If necessary, a device laboratory can be set up
II.Petrochemical laboratory constructionLocation Requirements
The petrochemical laboratory construction planning process should avoid noise, vibration, electromagnetic interference and other pollution sources, or take corresponding protective measures.For the harm caused by the experiment, corresponding environmental protection measures should also be taken to prevent the impact on the surrounding morning environment.
Three.Petrochemical laboratory constructionInternal Considerations
The oil chemical laboratory is divided into simplified analysis room and chromatographic analysis room. Emergency evacuation should be considered. The width of the laboratory door should not be less than 1m.There are safety gates with a height of not less than 2.1m.The channels in the laboratory are required to be smooth to prevent channel blockage in the event of a critical situation. Laboratory layout schemes such as U-shaped and L-shaped are commonly used in design.The main channel and the two central platforms are operated on both sides, the distance between them is greater than 1.5m, and the one-way distance between the side platforms is greater than 1.3m.
Four.Petrochemical laboratory constructionPlanning Matters
The petrochemical laboratory must meet the requirements of fire prevention, moisture resistance, anticorrosion, etc. It has functions such as ventilation, purification, disinfection, and sterilization: the ground should be solid and wear-resistant,Waterproof and non-slip, no dust accumulation, and has the performance of acid and alkali corrosion resistance: the wall should be smooth, no glare, and no dust; the laboratory should not be suspended.Natural lighting should be used, and direct sunlight should be avoided as much as possible. The laboratory should reserve exhaust pipes and independent sewage pipes. The toxic and harmful gases and liquids produced in the test should be treated and discharged to meet the discharge standards.
边栏推荐
猜你喜欢
随机推荐
LeetCode中等题之比较版本号
IDC第一的背后,阿里云在打造怎样的一朵“视频云”?
没有接班人,格力只剩“明珠精选”
47Haproxy集群
专有云ABC Stack,真正的实力派!
[Collection] HashSet and ArrayList lookup Contains() time complexity
47Haproxy Cluster
MySQL相关问题整理
人脸考勤是选择人脸比对1:1还是人脸搜索1:N?
How to do foreign media publicity to grasp the key points
H264 码率控制
camshift achieves target tracking
第5章 虚拟存储器
Alibaba Cloud Jia Zhaohui: Cloud XR platform supports Bizhen Technology to present a virtual concert of national style sci-fi
线代 | 秒杀方法与技巧
Prada, big show?In the yuan in the universe that!
部署项目半途而废后续
[List merge] Combine multiple lists into one list
48 the mysql database
技术人必看!数据治理是什么?它对数据中台建设重要吗?